Site C work camp construction nears completion in April 2016. Called Two Rivers Lodge, the camp cost $470 million to build and operate and is a self-contained community with an 800-seat dining room, hair salon, gym, movie theatre and private room accommodations. (B.C. Hydro)

Environmental groups slam NDP decision to continue with Site C

Construction industry, meanwhile, is cautiously optimistic about how the project will look

Environmental groups denounced Premier John Horgan as he announced Monday the province would continue to build the Site C dam.

The Wilderness Committee told Black Press they were “massively disappointed” with what they called the NDP’s “flip-flopping” on the now-$10.7-billion northern B.C. megaproject.

“We can only come to the conclusion that Horgan was lobbied extensively by some of the construction unions,” said national campaign director Joe Foy.

READ: Site C dam goes ahead, cost estimate now up to $10.7 billion

According to the organization, the Site C dam could flood 83 kilometres of the Peace River from near Fort St. John upstream to Hudson’s Hope, contaminating fish stocks, and remove farmland from the Agricultural Land Reserve.

Foy took issue with the province’s claim that it would have cost $4 billion to halt the project, as well as Horgan’s stance that that money could not be paid back over time.

“We believe that is grossly overestimated,” he said. “All that dam can do, unlike the hole in the ground which just sits there, is lose us hundreds of millions of dollars every year it operates.”

He said the NDP’s decision could change B.C.’s political landscape as NDP voters who may feel betrayed move away from the party. Horgan had campaigned earlier this year on a promise to review, not kill, the dam, but he had criticized the BC Liberals’ approach to the project in the past.

More lawsuits expected

Court challenges, Foy said, are likely coming both from environmental and First Nations groups.

“I think rolling over First Nations in this way is unacceptable,” he said. “I think we will begin to see the effects of protests.”

Amnesty International called Horgan’s decision “a blatant betrayal of his government’s commitments to uphold the rights of Indigenous peoples.”

The group called foul on the province’s claim that it was too late to stop the project and said the West Moberly and Prophet River First Nations will continue their legal efforts.

‘We are relieved’

Meanwhile, the Independent Contractors and Businesses Association celebrated the thousands of jobs they believe will be kept and created by continuing work on Site C.

Spokesperson Jordan Bateman said all the extra time the NDP government took to have the dam reviewed was unnecessary, only to have Horgan ultimately go forward.

READ: BC Utilities Commission completes Site C report

Bateman said he also doesn’t buy the province’s new $10.7-billion estimated price tag. When it was approved by the then-Liberal government in 2014, the project was estimated at $8.8 billion.

“You have one analysis done in six weeks that says it could run over budget,” he said. “Frankly, the overruns that the NDP are planning for here are going to be caused by the NDP.”


@katslepian

katya.slepian@bpdigital.ca

Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

The Campbell River Gun Club outdoor range is located on Argonaut Road west of Campbell River. CRGC/Facebook photo
Campbell River Gun Club range shutdown after complaints of stray bullets

The Campbell River Gun Club has shut down its rifle and pistol… Continue reading

RCMP display some of the fish seized from three suspects who pleaded guilty to violating the Fisheries Act in 2019, in this undated handout photo. THE CANADIAN PRESS/HO - RCMP
3 banned from fishing, holding licences after overfishing violations in Gold River area

Mounties seized the group’s 30-foot fishing vessel and all equipment on board at the time

Students at a previous NICBot Camp at the Campbell River campus show off what kind of tasks they’ve programmed their robot to do. Mirror File Photo
Youth camps are back at NIC this summer

Camps offered ‘with full health and safety plans in place to ensure the safety of all our students’

A 3.0-magnitude earthquake occurred off Ucluelet just after 12:30 a.m. on April 10 and was reportedly felt as far south as Oregon. (Map via United States Geological Survey)
Quake off Ucluelet reportedly felt as far south as Oregon

Magnitude 1.5 earthquake also reported off Vancouver Island’s west coast hours earlier

People take part in an anti-curfew protest in Montreal on Sunday April 11, 2021. Hundreds of people gathered in Old Montreal tonight in defiance of a new 8 p.m. curfew. THE CANADIAN PRESS/Giuseppe Valiante
VIDEO: Hundreds defy Montreal’s 8 p.m. curfew in violent, destructive protest

Quebec reported 1,535 new COVID-19 cases on Sunday, as well as five additional deaths linked to the virus

Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

Dr. E. Kwok administers a COVID-19 vaccine to a recipient at a vaccination clinic run by Vancouver Coastal Health, in Richmond, B.C., Saturday, April 10, 2021. THE CANADIAN PRESS/Jonathan Hayward
B.C. to register people ages 40+ for COVID-19 vaccines in April

Appointments are currently being booked for people ages 66 and up

A volunteer disinfects a historical Mohabat Khan mosque ahead of the upcoming Muslim fasting month of Ramadan, in Peshawar, Pakistan, Friday, April 9, 2021. (AP Photo/Muhammad Sajjad)
For Canadian Muslims, second pandemic Ramadan is a time of hope and sadness

Many members of the association are trying to find ways ‘to help people stay connected to one another’

South Surrey farmland, March 2020. The province’s crackdown on secondary residences sparked protests that have the NDP government engaged in a lengthy rewrite of its legislation. (Tracy Holmes/Peace Arch News)
B.C. NDP now wants to keep even ‘non-farmers’ on the land

‘Grandfathering’ of second residences extended again

Photos of Vancouver Canucks players are pictured outside the closed box office of Rogers Arena in downtown Vancouver Thursday, April 8, 2021. The Vancouver Canucks say 25 players and coaches have tested positive during a COVID-19 outbreak that involves a variant of the virus. It is now the biggest reported outbreak in the NHL this season. THE CANADIAN PRESS/Jonathan Hayward
Canucks’ return to practice pushed back as player added to COVID protocol list

COVID outbreak has led to eight games being cancelled

People walk past the Olympic rings in Whistler, B.C., Friday, May 15, 2020. Whistler which is a travel destination for tourists around the world is seeing the effects of travel bans due to COVID-19. THE CANADIAN PRESS/Jonathan Hayward
Adults living, working in Whistler, B.C., eligible for COVID-19 vaccine on Monday

The move comes as the province deals with a rush of COVID-19 and variant cases in the community

RCMP crest. (Black Press Media files)
UPDATE: RCMP investigating after child, 6, dies at motel in Duncan, B.C.

The BC Coroners Service is conducting its own investigation into the circumstances around the child’s death

Most Read