Illustration shows new Pattullo Bridge will have four vehicle lanes with a divider and separate lanes for pedestrians and cyclists. (Ministry of Transportation)

Contractors picked for B.C.’s Pattullo Bridge replacement

Acciona, Aecon to build union-only four-lane Fraser crossing

The B.C. government has picked a partnership of construction giants Acciona and Aecon to build the replacement for the aging Pattullo Bridge between Surrey and New Westminster.

Estimated at a cost of $1.377 billion, the new bridge and connecting roads are scheduled to be completed in 2023. Built north of the existing 83-year-old structure, the new bridge will still have only four vehicle lanes, plus pedestrian and bike lanes and a new off-ramp to Highway 17, the South Fraser Perimeter Road.

In a year-end interview with Black Press, Premier John Horgan said the Pattullo crossing is a higher priority than the congested George Massey Tunnel because the Pattullo is “falling into the river.” It is one of three projects designated by the NDP government’s “community benefits agreement” that requires construction workers to be a member of one of 19 mostly U.S.-based unions.

Transportation Minister Claire Trevena has acknowledged that the union-only deal would add about seven per cent to the cost of the project, or nearly $100 million in the case of the Pattullo.

Trevena and Horgan say the new public construction rules will result in more local hiring and use of apprentices. The Independent Contractors and Business Association cites statistics from the government’s Industry Training Authority showing three out of four apprentices are sponsored by open-shop companies, not building trades unions that run their own training facilities.

Acciona is a Spain-based multinational that is also a major contractor on the Site C dam in northern B.C. and the Walterdale Bridge in Edmonton. Its original bid was with a group including SNC Lavalin, but the Quebec-based company dropped out and the successful consortium with Aecon is called Fraser Crossing Partners.

RELATED: Pattullo Bridge seismic work scrapped as ‘cost-prohibitive’

RELATED: OUTLOOK 2020: John Horgan on forestry and union labour

RELATED: Cost jumps 35% for union-only Highway 1 widening job

Aecon Group is a long-established Ontario-based company that is building the Annacis Island wastewater treatment plant in Delta and has contracts for the Coastal GasLink pipeline across northern B.C., as well as refurbishing the John Hart Dam on Vancouver Island and the Darlingon nuclear plant in Ontario.

The Canadian government intervened in 2018 to block the sale of Aecon to China’s CCCI International Holding. Innovation Minister Navdeep Bains said at the time the decision was the result of a “multi-step national security review process.”

In a statement from its Chicago office Friday, Acciona said it and Aecon have been selected as the preferred proponent “to design, construct, and partially finance during construction” the new Pattullo Bridge.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislature

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Show us your positive messages, gestures and actions

Pinecrest teachers send message to their school community

No more ferries will sail from Departure Bay, Mill Bay, Brentwood Bay during COVID-19 pandemic

B.C. Ferries announces major changes to sailing schedules for 60 days starting Saturday, April 4

Johnny Dollar Plumbing & Heating offers to pick up meds, groceries in Campbell River

Company’s trucks are available to help out those who are self-isolating due to illness or age

Campbell River School District approves three-year calendar

Calendar aligns with Comox Valley School District and includes two-week spring break

VIDEO: ‘Used gloves and masks go in the garbage,’ says irked B.C. mayor

Health officials have said single-use gloves won’t do much to curb the spread of COVID-19

Campbell River community COVID-19 agencies, services and resources list

The list outlines status of social agencies in the community

Sex workers face new risks during COVID-19 pandemic

‘Desperation has kicked in’ for vulnerable, undocumented workers unable to access help

Unclear if Cowichan couple refusing to self-isolate will face penalty

No fines or charges have been laid to date, including Cowichan couple who won’t self isolate

COVID-19: Postponed surgeries will be done, B.C. health minister says

Contract with private surgical clinic to help clear backlog

Black Press Media ad sparks discussion about value of community newspapers

White Rock resident hopes front-page note shines light on revenue loss during COVID-19 crisis

Nanaimo man arrested after allegedly setting house fire

Firefighters arrived to find mobile home ablaze on Barnes Road in Cedar on Thursday

Emergency funding available for North Island College students

Funding for students experiencing financial strain that may affect their ability to continue studies

Most Read